2012-08-10 -35 149

From Geohashing
Revision as of 05:50, 10 August 2012 by imported>1PE (update)
Fri 10 Aug 2012 in -35,149:
-35.0898871, 149.6078613
geohashing.info google osm bing/os kml crox


Location

In a paddock off the Tarago-Collector Road, near the Tarago-Bungendore Road, Tarago, NSW.

Participants

1PE

Plans

1PE

I thought about the ~90 minute excursion over lunch-time. I had to stay back at work in the evening, anyway......

Expedition

1PE

The trip was to a hash point ~45km "as the crow flies", and ~55km by road, along mostly country roads with 100km/h signage. From Queanbeyan, I took the road to Bungendore, then straight through towards Tarago. On this road I passed two recent hashes (2012-08-01 -35 149 and 2012-08-01 -35 149) that were not able to be reached due to access issues. The turn-off from the Bungendore-Tarago Road onto the Tarago-Collector Road was interesting, and gave me the first idea of what was coming; the corner was recently rebuilt and re-tarred, and there was a large truck stopped waiting for me to turn. (This was "the middle of nowhere".)

I had observed that the property had a farm house a little past the hash, and decided to go there first to seek permission. As I drove up, I saw a person inside the house, so knocked and stepped well back so she would not feel threatened. I exp-lained what I wanted to do; walk in from the road. The woman told me that the property was owned by a company operating the adjacent waste processing facility, and that I needed to go there to seek permission.

Three kilometers down the road is the site office for the Woodlawn Bioreactor, the world's largest purpose-built site for processing and recovering energy from landfill.

  • I was put in a large room with a video of the site and waste processing for about 10 minutes, while I waited for the manager to be free to see me.
    • Veolia bought the former copper/lead/zinc open-cut mine (Woodlawn) with is gradually filling it with trash and general waste from Sydney (about 250km away) at the rate of about 8,000 tonnes a week. The capped levels of waste gradually decay, and Veolia is capturing methane gas to burn it and create 'green' electricity. The former tailings dams will be rehabilitated with processed "green waste". The area is an "ecological farm" complex including processing of waste water through a fish farm, and a hydroponics facility for cleaning the water, and surrounding rural farms that have been purchased. The adjacent hills also have the Capital Wind Farm. The site area is operated by Veolia Environment.
  • The manager arrived just as the video ended, understood geohashing after my explanation, but said that Workplace Health and Safety laws meant that he could not authorise access.
  • I said that I would get some pictures from the road, urged him to take a copy of the activegeohasher.com print-out and look at the site next week, said I'd drop the original in to the farmhouse, and then left.

The woman at the farmhouse thanked me for the details.

The grass by the road had grown very thick from the recent rains, but I reached the raised bank beside the road and the fence near the farm dam that is near the hash site.

Photos

Achievements

None likely.